Lead time: 22 days

Project description:
A project for the construction of a car dealership with an exhibition and office area located on the territory of the client "Mack". The execution includes a metal supporting structure, cladding with polyurethane thermal panels and installation of aluminum windows with interrupted thermal bridge, providing excellent thermal insulation and modern appearance.

The structure is welded in place from pre-sized metal profiles to suit the loads and functional requirements of the site. The outer skin is constructed of polyurethane-filled thermal panels, which offer high energy efficiency and long-term resistance to external conditions.

The installed aluminium window frames with an interrupted thermal bridge contribute to optimal thermal insulation and condensation protection, while highlighting the contemporary look of the showroom and creating a transparent and welcoming atmosphere for customers.

Final result:
The project was completed within 22 days, with precise completion of all stages - from construction to joinery. A functional, aesthetically pleasing and energy efficient building has been achieved, fully in line with the needs of the retail outlet and its representative function.

Send us your inquiry